05/23/2026
Date: 5/19/26
Location: Front ST Waterfront Park
City/State: Bangor Maine
π π π Details
Hereβs Photos of The Crew of Brewer Fire 301 305 Going Over The Joshua Chamberlain Bridge Heading Back into to Their Coverage Area After Joining Other Fire Agencies and the State DEP For Contaminate Spill Training over on the Bangor Side of the Penobscot River
301-2018 Pierce Enforcer PUC Pumper (1500/750/CAFS) Husky 12 Foam System
305-2000 Pierce Dash 200 (2000/500) 105β Aerial Rear Mount Ladder
Β©οΈFire Buff JB Photography
πΈ By John Bunker