04/06/2026
Dredging is now underway on the River Hull!
Over the next three months, silt will be removed from the river with clean water, then returned back with the silt removed offsite.
The Arctic Corsair is actually longer from Bow to stern than the River is wide in this location, so this work is vital to bring her in safely.
From this perspective, you can really see how much space she needs (top dock)
Hull City Council
Hull Maritime