04/05/2026
WHAT HAPPENS AT THE YARD | APRIL 2026
April has been an active month at the yard, with several projects completed and others moving into their next phase.
Over the past weeks, several refit and maintenance projects have been delivered, while work continues across the yard.
SeaBear came in for several specific works. Her patented Olivier van Meer Design keel construction was inspected, cleaned and repainted, the drinking water tank was cleaned and coated, and the coach roof was fully renewed after removal of the teak, hatches and dorades.
Simmerdream returned to us during the winter period. Systems were checked, finishes reviewed and small adjustments made to ensure everything is as it should be.
Papillon was with us for maintenance and service, preparing her for the season ahead.
A familiar yacht also returned. In 2023, we completed a full interior and exterior refit of Taeke Hadewych together with Olivier van Meer Design. He is now back with us for minor maintenance, readying him for the new season.
Puffin 42 has successfully completed her sea trials. The finishing touches are now being applied before she is handed over to her owner.
On Jeff, progress continues as we build her back up. The aluminium roof has been painted, preparations are underway to add canvas for protection from the elements, and the new floor stays true to the boat’s character.
Selene is being prepared for the season ahead. Her hull, inner bulwarks and superstructure have been resprayed, the exterior woodwork has received a new coat of varnish, her mast has been reinstalled, the boom upgraded, and a new bimini canvas has been added.
The Sport Fish series is progressing well. On the Express version, the interior is close to completion, while the coverboards and propeller shafts are now in place.
Work on Patriot continues. This refit is carried out by Holland Jachtbouw as part of the VMG Group, in collaboration with Vripack Yacht Design. She is fully wrapped for spray work on the hull, inner bulwarks and deck. After that, work on the underwater body will continue, followed by the next stages of the refit, including deck installation, the crew bathroom and the rebuild, with systems gradually being reinstalled.
We look forward to sharing more next month!