Upside Drone Photography

Upside Drone Photography Davon Yoder- Central Illinois Based Part 107 Licensed Drone Pilot. Now with thermal capabilities! Wanting some aerials? Message me for rates.

09/10/2026

9/8/2026

Harvest time is here and the view is quickly changing as we go from summer to fall.









Harvest photos from 9/8/2026.
09/10/2026

Harvest photos from 9/8/2026.





09/04/2026

9/3/2026

Happened to be at the right place at the time to capture the last blade being attached to the hub of T28. This is number 6 of 51 GE 6.1-158 turbines on the Coles Wind project that is fully assembled.

Living within the project footprint gives me more opportunities to capture parts of the construction process. If there is something you want me to show more of, leave a comment or message me.





8/28/2026Crane is being disassembled to move from one site to the next because it's crossing a road. Also note the miles...
09/01/2026

8/28/2026

Crane is being disassembled to move from one site to the next because it's crossing a road. Also note the miles of underground cables that are being trenched in.





08/25/2026

8/24/2026

Here's a time lapse of the blades being installed on T29.

This is the fourth turbine completed with quite a few more towers started. With 3 of the largest cranes on the project, progress is happening very quickly.





Rural Coles County sunsets are some of the best!
08/18/2026

Rural Coles County sunsets are some of the best!

08/07/2026

Time lapse over the past few days showing a brief glimpse of the blades being attached to the hub and being adjusted.




August 6, 2026T3 has been assembled including hub and blades. Pictures don't do justice to how tall it is. The large cra...
08/07/2026

August 6, 2026

T3 has been assembled including hub and blades. Pictures don't do justice to how tall it is. The large crane has moved to T1 location. It appears that there are at least 2 other cranes that are similar size on the project.





July 28, 2026T3 tower is completed and nacelle is in place. Also note the blades have been assembled. A lot of collectio...
07/29/2026

July 28, 2026

T3 tower is completed and nacelle is in place. Also note the blades have been assembled. A lot of collection lines are being trenched in as well. There are 5 towers started already and progress is happening very quickly.





07/24/2026

Address

801 Blackburn Point Road
Osprey, FL

Website