07/19/2024
B frame - Proposal for a Site specific Installation & Performance by Marc Lins
The “B frame” is a proposal to the Municipality of Barcelona for a site-specific installation and performance.
Shape, proportions and colors of the sculpture are designed to precisely match the official signage of the City of Barcelona.
The proposal outlines a production and completion time frame of approximately 8 weeks, to be conducted in a semi-public setting such as a street-level display window. Upon completion, the “B Frame” is intended to be on show in various public locations throughout the city of Barcelona.
Barcelona.cat BCNCultura.cat
Many thanks for the renderings by
Bernhard Ranner